The
sunroom is squeezed onto the north east corner of the site behind
the front setback |
The
side elevation and entry. A blank wall gives privacy from the approach
to the house |
|
|
Front
elevation showing the use of a stone "piano nobile" sub
floor. |
We've
excavated for the footings. |
|
|
Demolition
begins |
The
steel columns erected and timber floor framing on site |
|
|
A
journey of a thousand miles begins with a single step |
The
steel structure is up and partly welded, and there's been a start
on laying the floor |
|
|
Plasterboard
lining is happening and it starts to take its final shape |
Finally
achieved lockup. All the fixout is done and we are waiting for the
electrical fit off. The stone base is next, and the floor tiling. |
|
|
The
renderer has started. |
The
first of the office furniture has gone in. |
|
|
And
the entry deck constructed. |
The
base stonework completedd |
|
|
And
finally some pergolas and lighting. |
|
|