The sunroom is squeezed onto the north east corner of the site behind the front setback The side elevation and entry. A blank wall gives privacy from the approach to the house
Front elevation showing the use of a stone "piano nobile" sub floor. We've excavated for the footings.

 

Demolition begins The steel columns erected and timber floor framing on site

A journey of a thousand miles begins with a single step The steel structure is up and partly welded, and there's been a start on laying the floor
Plasterboard lining is happening and it starts to take its final shape Finally achieved lockup. All the fixout is done and we are waiting for the electrical fit off. The stone base is next, and the floor tiling.
The renderer has started. The first of the office furniture has gone in.

 

And the entry deck constructed. The base stonework completedd
 
And finally some pergolas and lighting.  

 