Site
plan for the Development Application |
Plans
and sections modified from the standard kit home design. |
|
|
Slab
preparation done and drainage is in.
|
Wall
frames up and the roof on.
|
|
|
Note
the flush threshold for the sliding door. The unit has to be designed
to the Adaptable Housing Code and be wheelchair accessible.
|
Virtually
externally complete, with only a verandah and a few finishing touches
to go. |
|
|
The
main living area. Due to the Adaptable Housing Code's requirements
we had to minimise hallways and other narrow circulation areas.
|
The
kitchen and laundry area sheeted and ready for the fixout and joinery.
|
|
|
The
kitchen design has been worked out and the joinery ordered. |
The
front verandah is on and some fencing up. |
|